Optimisation et Analyse des Systèmes Industriels et de Service (UR-OASIS-ENIT)
> Liste des publications :
Articles dans des revues indexées ( 1 à 10 sur 19 )
2011
-
Balma A., Ben Hadj-Alouane N. and Hadj-Alouane A. B. - A branch-and-price approach for an integrated capacity dimensioning and demand routing in SDH/WDM networks. Int. J. Business Performance and Supply Chain Modelling , Vol. 3(1) , n° , pp 3-17, 2011.
-
Belhaj Seboui A., Ben Hadj-Alouane N., Delaval G., Rutten E. and Yeddes M. - An approach for the synthesis of decentralised supervisors for distributed adaptive systems. Int. J. Critical Computer-Based Systems , Vol. 2(3/4) , n° , pp 246-265, 2011.
-
A. Balma, N. Ben Hadj-Alouane and A. B. Hadj-Alouane - A near-optimal solution approach for the multi-hop traffic grooming problem. IEEE/OSA Journal of Optical Communication Networking , Vol. 3(12) , n° , pp 1-11, 2011.
-
M. Ben Aissa, A. Kombas and H. Chabchoub - Facility location model for reverse logistics. Advances in Production Engineering & Management , Vol. 6(1) , n° , pp 37-44, 2011.
2010
-
Alpan G., Larbi R. and Penz B. - A bounded dynamic programming approach to schedule operations in a cross docking platform. Computers & Industrial Engineering , Vol. doi: 10.1016/j.cie.2010.08.012. , n° , pp , 2010.
-
Alpan, G., Ladier A-L., Larbi R. and Penz B. - Heuristic solutions for transshipment problems in a multiple door cross docking warehouse. Computers & Industrial Engineering , Vol. DOI: 10.1016/j.cie.2010.09.010 , n° , pp , 2010.
-
Hadda, H., Dridi N., Hajri-Gabouj S. - An improved heuristic for two-machine flow shop scheduling with an availability constraint and nonresumable jobs. 4OR , Vol. 8(1) , n° , pp 87-99, 2010.
-
Bouzaiene A., Dridi N., Aloulou M. A., Vanderpooten D. - A bicriteria flow-shop scheduling problem with two serial batching machines. Electronic Notes in Discrete Mathematics , Vol. 36 , n° , pp 1177-1184, 2010.
-
Bekrar, A., I. Kacem, C. Sadfi and C. Chu - An improved heuristic and an exact algorithm for the 2D strip and bin packing problem. International Journal of Product Development , Vol. 10 (1/2/3) , n° , pp 217-239, 2010.
-
Benjaafar, S., J. P. Gayon, and S. Tepe - Production-Inventory Systems with Customer Impatience. Operations Research Letters , Vol. 38 , n° , pp 267-272, 2010.
Communications dans des congrès
Pas de communications dans des congrès.
Ouvrages / chapitres d'ouvrages
Pas d'ouvrages / chapitres d'ouvrages.
>> retour
Dernière mise à jour le 08-12-2011